ANCHOR Arkansas logo ANCHOR ArkansasDock Here for Support.
VISIT The service encounter.VEHICLE One way ANCHOR carries the visit.NETWORK Statewide mobile field capacity.DOCKS Local anchors for continuity and follow-up.
Neurodivergent-first. Person-centered. Universally designed.MAV is built around autistic and neurodivergent Arkansans—current residents, people growing into new life stages, and people who move to Arkansas in the future. The same clearer communication, lower sensory load, predictable steps and flexible access can help anyone who needs them.
How person-centered access works
4Operating zonesManagement, staffing and shared-capability regions.
8Route clustersSmaller recurring planning circuits.
75CountiesEvery county assigned once for planning; boundaries remain proposed.

Proposed statewide operating plan

Cover Arkansas with a network—not a convoy.

The proposed plan divides all 75 counties into four operating zones and eight route clusters. The boundaries are an ANCHOR planning design derived from county geography and USDA rurality data; they are not official state service regions. Final routing should be adjusted with drive-time, transit coverage, service demand, provider capacity, host readiness and community input.

Operating zones

Regional management with statewide standards.

ZONE A

Northwest + West

12 counties · 920,374 residents (2020)

7 nonmetro counties · 5 counties in RUCC 7–9

Northwest + River Valley / West
ZONE B

North + Northeast

20 counties · 531,317 residents (2020)

18 nonmetro counties · 13 counties in RUCC 7–9

North Central / Ozarks + Northeast
ZONE C

Central + Delta

21 counties · 1,152,144 residents (2020)

13 nonmetro counties · 7 counties in RUCC 7–9

Central + Delta / East
ZONE D

South + Southwest

22 counties · 407,689 residents (2020)

20 nonmetro counties · 17 counties in RUCC 7–9

South Central + Southwest / Ouachita

Route clusters

Eight recurring circuits cover all 75 counties.

County population values are 2020 Census populations carried in USDA's 2023 RUCC file. “Nonmetro” means RUCC 4–9. RUCC 7–9 is used here as an ANCHOR planning flag for the smaller/nonmetro end of the continuum—not as a federal eligibility rule.

01

Northwest

4 counties · 574,985 residents · 1 nonmetro · 0 RUCC 7–9

Benton, Washington, Carroll, Madison
02

River Valley / West

8 counties · 345,389 residents · 6 nonmetro · 5 RUCC 7–9

Crawford, Sebastian, Franklin, Logan, Scott, Johnson, Pope, Yell
03

North Central / Ozarks

8 counties · 163,745 residents · 8 nonmetro · 7 RUCC 7–9

Boone, Newton, Searcy, Marion, Baxter, Stone, Van Buren, Cleburne
04

Northeast

12 counties · 367,572 residents · 10 nonmetro · 6 RUCC 7–9

Clay, Greene, Craighead, Mississippi, Poinsett, Lawrence, Randolph, Sharp, Fulton, Izard, Independence, Jackson
05

Central

11 counties · 987,070 residents · 4 nonmetro · 1 RUCC 7–9

Pulaski, Saline, Faulkner, Lonoke, White, Perry, Conway, Prairie, Garland, Hot Spring, Grant
06

Delta / East

10 counties · 165,074 residents · 9 nonmetro · 6 RUCC 7–9

Crittenden, Cross, St. Francis, Lee, Phillips, Monroe, Woodruff, Arkansas, Desha, Chicot
07

South Central

10 counties · 207,633 residents · 10 nonmetro · 9 RUCC 7–9

Jefferson, Cleveland, Lincoln, Drew, Ashley, Bradley, Dallas, Calhoun, Ouachita, Union
08

Southwest / Ouachita

12 counties · 200,056 residents · 10 nonmetro · 8 RUCC 7–9

Clark, Pike, Montgomery, Polk, Sevier, Howard, Hempstead, Nevada, Columbia, Lafayette, Little River, Miller

Initial operating package

Start statewide without buying eight large clinic buses.

4 × MAV-Lite teams

One attached to each operating zone

Navigator + peer/access specialist + mobile operations capacity, portable host-site kit, equipment delivery and field follow-up.

2 × Access Vans

Shared between paired zones

Accessible high-roof units for private support, telehealth, equipment trials and recurring regional service days.

1 × MAV-Plus

Statewide shared capability

Higher-capacity unit for specialist days, complex multi-service deployments, larger community events and field demonstrations.

4 × Sensory / Host kits

Permanent regional deployable inventory

Turn an existing library, college, clinic, health unit or community room into a temporary ANCHOR access point.

1 × Mobility Desk

Statewide transportation coordination

Maps ARDOT transit, Medicaid NET, specialized transportation and partner ride options; tracks where transportation still blocks access.

Shared specialist pool

Telehealth + scheduled field days

Clinical lead, community paramedicine, AAC/SLP, OT/sensory, benefits/waiver, bilingual and other expertise rotates based on actual need.

Phasing

Build routes from evidence, then add vehicles where utilization proves the need.

  1. 0–6 months

    Field standard + agreements

    Finalize privacy, scope, safety, route data, host agreements, transportation directory, mobile equipment standards, workforce training, consent and referral/follow-up protocols. Build a verified host registry in all eight clusters.

  2. 7–18 months

    Statewide route pilot

    Launch four light field teams and shared Access Vans. Establish at least one predictable recurring host stop per cluster before adding one-off events. Measure travel burden, no-show/missed connection, handoff completion and service gaps.

  3. 19–36 months

    Demand-shaped expansion

    Add standard Access Van capacity in zones where private/telehealth/mobile-tech demand exceeds portable host-site capacity. Add partner contracts instead of duplicate staff where local services already exist.

  4. Year 4+

    Permanent statewide network

    Retain recurring routes, move or add stops based on utilization and access outcomes, and consider separate passenger mobility vehicles only where transportation data shows persistent unsolved gaps.

Route-selection score

Schedule visits from evidence, not politics or whoever asks loudest.

25%

Travel + rurality

USDA RUCC, drive time to current access points, terrain and recurring travel burden.

20%

Service-gap pressure

Provider shortage, waitlists, missing adult/child pathway, repeated referral failure.

20%

Documented demand

Requests, referrals, missed appointments, partner reports and prior MAV utilization.

15%

Transportation gap

Transit/NET availability, missed rides, inaccessible schedules or no viable trip option.

10%

Host readiness

Accessible space, privacy, utilities, local outreach and reliable recurring availability.

10%

Equity + continuity

Communities repeatedly missed by existing service patterns and ability to close follow-up.

Weights are a proposed starting model for public review. ANCHOR should publish the methodology, test it against real outcomes and revise it rather than hiding route decisions inside an administrative black box.

County dataset is included in this site.

data/arkansas-counties-rucc.json contains all 75 Arkansas counties, 2020 population, 2023 RUCC code/description, proposed route cluster, operating zone and MAV planning band.

Ask KacklesHelp, search, and page guidance
Language